BRO Opens Bridge over Teesta River in North Sikkim

New Delhi: In a relief to the residents of Lachen in North Sikkim, the Border Roads Organisation (BRO) on March 21 opened for traffic 360 feet long bailey suspension bridge over Teesta River in Munshithang near Chungthang town.

The 86 Road Construction Company (RCC) of 758 Border Roads Task Force (BRTF), under Project Swastik, commenced the construction of the bridge in October 2019 and completed it in January 2020.

ads

The approach roads to the bridge have also been constructed. The bridge will give impetus to tourism and facilitate the movement of logistics for the Armed Forces deployed in forward areas.

In June 2019, a steel bridge of 180 feet span at the same location was completely damaged due to a massive cloud burst resulting in severing the lines of communication in North District of Sikkim. The connectivity was kept open by routing the traffic through restricted Army land.

More like this

Russia-Ukraine Entanglement: India’s Delicate Balancing Act

After more than four years of conflict, Russia occupies...

Chinese HQ-9B Air Defence Systems Failed to Intercept US-Israel Airstrikes on Iran

Tel Aviv: China and Russia are poised to resupply...

Groping for an Exit

As the US-Iran war rages on, there are no...

Beyond Zero-Sum: India and China as Partners in the Critical Minerals Race 

Critical minerals such as lithium, cobalt, nickel, graphite, and...

Amazon Air Expands to Northeast India, Delivery Speeds to Become 5X Faster

New Delhi. Amazon March 14 announced the expansion of Amazon...

Iran’s Decentralised ‘Mosaic Defence’  and ‘Fourth Successor’ Leadership Models

As US-Israel versus Iran conflict intensifies, Iran’s decentralised “Mosaic...

India Needs to Focus on Formulating a Strong Air Defence Strategy: Ex IAF Chief

New Delhi: In light of the ongoing conflict in...
Indian Navy Special Edition 2025spot_img