HAL Sets Up Rs 208 Crore Rocket Engine Manufacturing Facility

Bengaluru: Defence Public Sector Undertaking (DPSU), Hindustan Aeronautics Limited has set up a Rs 208 crore Integrated Cryogenic Engine Manufacturing Facility (ICMF) here that would cater to the entire rocket engine production under one roof for Indian Space Research Organisation (ISRO).

President Droupadi Murmu will inaugurate the state-of-the-art ICMF, set up over an area of 4,500 square metre housing over 70 hi-tech equipment and testing facilities for manufacturing cryogenic (CE20) and semi-cryogenic (SE2000) engines of Indian rockets, on September 27.

ads

In 2013, an MoU was signed with ISRO for establishing the facility for manufacturing cryogenic engine modules at HAL, Aerospace Division, and it was subsequently amended in 2016 for setting up of ICMF with an investment of Rs 208 crore. The commissioning of all the critical equipment for the manufacturing and assembly requirement has been completed, Bangalore-headquartered HAL said, adding that the pre-production activities which involve preparation of the process and quality plans, and drawings, has also commenced.

HAL said in a statement that it would start realising the modules by March 2023. HAL Aerospace Division manufactures liquid propellant tanks and launch vehicle structures of Polar Satellite Launch Vehicle (PSLV), Geosynchronous Satellite Launch Vehicle (GSLV MK-II), GSLV MK-III and also stage integration for GSLV MK-II.

“The facility (ICMF) will cater to the entire Rocket Engine Manufacturing under one roof for ISRO. The facility will boost self-reliance in manufacturing of Hi-thrust Rocket engines,” the HAL statement said.

Cryogenic engines are the most widely used engines world over in launch vehicles, the statement said. Due to the complex nature of the cryogenic engine, till date only a few countries — the USA, France, Japan, China and Russia — have mastered the cryogenic technology.

big bang

On January 5, 2014, India successfully flew GSLV-D5 with a cryogenic engine and became the sixth country in developing cryogenic engines, it said.

HAL-L&T consortium recently bagged the Rs 860 crore contract for end-to-end realisation of five PSLVs over a period of four years from the NewSpace India Limited (NSIL), the commercial arm of the Department of Space.

huges

More like this

Blocking The Straits

One of Trump’s stated objectives in his current conflict...

ideaForge Receives TDB Nod for Financial Assistance of Rs 151 Crore Under RDI Scheme to Advance Heavy-Lift UAV Platform ‘YETI’

Mumbai: ideaForge Technology Limited, India’s leading manufacturer of unmanned...

India’s Quantum Future Needed Teachers Before It Needed Students. QNu Labs and SRM Just Trained Them

Bengaluru: India's quantum skilling model just changed. Instead of training...

IAF Chief Urges Rapid Indigenous Drone Push

New Delhi. Speaking at a workshop organised by the...

Fifth Ship of Diving Support Craft Project – DSC A24 Launched

Kolkata: The fifth ship (DSC A24) of five Diving Support Craft...

Beijing’s Taiwan Clock: Ticking Faster Than Its Economy

on July 1, 2026, Xi Jinping stood before the...

India Must Rapidly Develop Deep-Tech Capability to Maintain Air Superiority: IAF Chief

NEW DELHI. In a resounding call for indigenous defence...

Advancing Defence Capabilities: Chinese Military Researchers Tap US AI Models

Washington: Chinese military researchers have used outputs from leading...
Indian Navy Special Edition 2025spot_img