Next Generation Jammer Mid-Band Takes to the Skies for Growler Flight Testing

Successful first flight an important step toward Milestone C

 

EL SEGUNDO, Calif. Built by Raytheon Intelligence & Space, a Raytheon Technologies business, the Next Generation Jammer Mid-Band flew on an EA-18G Growler – its first flight test on the aircraft. The US Navy’s NGJ-MB is an advanced electronic attack system that denies, disrupts and degrades enemy technology, including communication tools and air-defense systems.

ads

“After hundreds of hours of successful ground and chamber testing, NGJ-MB’s first Growler flight test marked a significant achievement for the program toward Milestone C and IOC,” said Annabel Flores, vice president of Electronic Warfare Systems for RI&S. “It’s a testament to the technology and the collaborative efforts of the RI&S team with the Navy’s engineering, integration and test teams.”

The first flight took place August 7, at the Naval Air Station Patuxent River, Maryland, meeting all objectives. Future mission systems flight testing will demonstrate weapons system control, power generation, and electromagnetic compatibility between jammer and aircraft, as well as the performance of NGJ-MB’s high-capacity digital waveform generation and active electronically scanned arrays in flight against a variety of targets. Data from these flight tests on the Growler will inform Milestone C – the Navy’s decision to start NGJ-MB production.

The flight follows more than 600 hours of ground testing of Engineering Development Model, or EDM, pods. At the Naval Air Stations Patuxent River and at Point Mugu, California, EDM pods underwent anechoic chamber testing – a special facility designed to absorb electromagnetic waves – to measure the jammer’s radio frequency power and beam-steering capabilities.

In addition to mission systems testing, the program is expected to begin aeromechanical flight testing shortly to assess aircraft flying qualities and performance, following previously completed ground vibration, static load, and wind tunnel testing. These tests will also evaluate the effects of the air flow environment on the pod, as well as noise and vibration behavior.

big bang

To date, RI&S has delivered 10 EDM pods: six mission systems pods and four aeromechanical pods. A total of 28 pods will be delivered under the EMD contract.

More like this

YARI Robotics Launches YARI V6X and YARI Atlas, its Flight Controller and Data Platform for Small Unmanned Vehicles

Coimbatore. YARI Robotics announced the worldwide launch of YARI...

India Stands at a Defining Moment

The international order is undergoing its most profound transformation...

India as Consequential Power: Testing Decade Ahead

Between roughly 2015 and 2025, India moved from being...

India Arrives: The Decade Power Stopped Being Borrowed

There is a particular kind of confidence that comes...

From Independence to Strategic Autonomy: India’s Next Decade of Uncrewed Capability

Every Independence Day invites India to look back at...

India’s Geopolitical Moment

As the world stands at an inflection point, the...

India’s Rise as a Consequential Power

A decade ago, India was a story the world found...
Indian Navy Special Edition 2025spot_img