US Army awards BAE Systems $148.3 million contract for M88A2 HERCULES armored recovery vehicles

BAE Systems has been awarded a $148.3 million contract by the U.S. Army to upgrade 43 M88A1 heavy-lift vehicles for added capability to evacuate damaged or stranded combat vehicles from the battlefield.

 

This continues the upgrade of the M88A1 to the M88A2 Heavy Equipment Recovery Combat Utility Lift System (HERCULES) configuration to increase power, maneuverability and survivability to reach the Army’s acquisition objective of 933 M88A2 vehicles.

ads

“The HERCULES is an invaluable vehicle for the Army’s recovery missions,” said Dennis Hancock, director of Recovery Programs at BAE Systems. “We are proud to support the Army’s recovery needs and we will continue to work alongside the Army to provide upgraded solutions as their missions and requirements change.”

“The HERCULES is an invaluable vehicle for the Army’s recovery missions,” said Dennis Hancock, director of Recovery Programs at BAE Systems. “We are proud to support the Army’s recovery needs and we will continue to work alongside the Army to provide upgraded solutions as their missions and requirements change.”

The more capable M88A2 tows, hoists, and winches 70-ton tracked vehicles used by the Armored Brigade Combat Team (ABCT). The M88A2 increases horsepower and upgraded armor protection including armored track skirts and applique armor panels. The M88A2 can maneuver more quickly and get a 70 ton stranded vehicle – and its crew – to safety. The execution of this contract will increase the total procured quantity of the M88A2 capability to 914.

Work on the program will be performed at the BAE Systems’ facilities in York, Pennsylvania; Aiken, South Carolina; Anniston, Alabama and Sterling Heights, Michigan. Deliveries are to begin in February of 2021.

More like this

Cold Start to Multi-Domain Compellence: Transformation of India’s Military Strategy

India’s quest for a credible and politically usable military...

Bharat Forge Reports Strong Sequential Recovery in Q4 FY26; FY27 Outlook Remains Positive

Pune: Bharat Forge Limited (BFL), a global leader in...

BEL Triumphs in Free Press Journal & CareEdge Annual Report Awards

Bengaluru: Navratna Defence PSU Bharat Electronics Limited (BEL) has been...

Turkey Unveils ICBM ‘Yildirimhan’, Israel Concerned

Tel Aviv: Turkey continues to establish itself as a...

IRC MBIR Advisory Board Committee on Materials and Fuel Research Meet in Moscow

Mumbai:  A meeting of the Committee on Material and Fuel...

EDGE and Orbitworks Localise Satellite Integration Capabilities through UAE Space Agency’s Sirb Programme

Abu Dhabi, UAE: EDGE’s space-focused entity, FADA, has finalised...

Europe’s Space Rider Signals a New Era in Reusable Spaceflight

The European Space Agency (ESA) is edging closer to...

Skyroot’s Unicorn Leap Marks India’s Arrival in the Global Private Space Race

India’s commercial space sector achieved a historic breakthrough on...
Indian Navy Special Edition 2025spot_img