Indigenous Fighter Aircraft Completes Full Cycle from Aircraft Carrier

 

New Delhi. Technology in Defence took a major step forward when indigenous aircraft LCA Naval Prototype-2 on September 29 launched off the ski jump at 1621 hours and subsequently “trapped” at 1631 hours on the arresting gear site of an aircraft carrier with both at Shore Based Test Facility INS Hansa in Goa

ads

While both these activities had been achieved individually earlier, this was the first occasion when the complete cycle of launch and recovery necessary for aircraft carrier operations was accomplished in a single sortie.

Being a pioneering technology acquisition and demonstration program for the unique Short Take-Off but Arrested Recovery (STOBAR) concept of aircraft operations, the LCA (Navy) team has had to conceptualise and experiment with complex software modes from a clean slate. All this had to be done while tentatively exploring and incrementally expanding the structural capabilities of the aircraft to withstand the brutal requirements of carrier operations.

The exploratory nature of this stage of the programme necessitates experimentation with multiple software options and hardware configurations. These include multiple configurations of aerodynamic surfaces, different flight control strategies, avionics tools and display symbols to ease the piloting task, multiple iterations to the “mechanicals” (dampers/structural members/contact points) etc.

Comprehensive and seamless integration of all these experimental variants simultaneously into a single platform is therefore not possible till all options have been evaluated and the preferred configuration has been decided.

big bang

Defence Minister Rajnath Singh has congratulated DRDO, ADA, HAL and Indian Navy for this major feat. Secretary, Department of Defence, R&D and Chairman DRDO Dr. G Satheesh Reddy also congratulated DRDO, ADA, HAL and Indian Navy for the achievement.

More like this

SAS Technology Presented “ARGUS”, an Integrated AI-Assisted ISTAR & Targeting Ecosystem, at “DOUREIOS IPPOS 2026”

Athens: SAS Technology successfully participated in the national joint exercise...

DRDO Validates Multi-Layered Ballistic Missile Defence Capability

The multi-layered Ballistic Missile Defence (BMD) tests confirm India’s...

Lt Gen Dhiraj Seth Appointed 31st Chief of Army Staff

Lt Gen Dhiraj Seth’s appointment as the 31st Chief...

IN-SPACe Selects First Three Startups for Technology Adoption Fund

On June 11, 2026, the Indian National Space Promotion...

Tunga Aerospace Secures L1 Status in Critical ITBP Drone Tender

The ITBP procurement process attracted 27 bidders, reflecting the...

Air India Crash Probe Continues with Diligence and Professionalism: Civil Aviation Minister

New Delhi: Civil Aviation Minister K Rammohan Naidu said...

Decisive Leap: Dharashakti Integrated EW Systems Cleared for Induction by DAC

New Delhi: The Defence Acquisition Council (DAC) has approved...

DRDO’s Indigenous NETRA AEW&C System to Receive Final Operational Clearance Soon

New Delhi: The Defence Research and Development Organisation’s indigenously...
Indian Navy Special Edition 2025spot_img