BAE Systems to provide additional payload tubes for new Virginia-class subs

 

BAE Systems has received a contract to produce payload tubes for two of the U.S. Navy’s new Virginia-class (SSN 774) submarines to support increased firepower on the Block V version of the attack subs. Under the contract with General Dynamics Electric Boat, a builder of the Virginia class, BAE Systems will deliver two sets, each consisting of four tubes, for the Virginia Payload Modules on the SSN 804 and SSN 805.

ads

The Virginia Payload Module (VPM) extends the length of the Block V submarines over previous versions of the Virginia-class by adding an additional mid-body section to create more payload space for greater firepower. Each large-diameter payload tube can store and launch up to seven Tomahawk cruise missiles. The VPM offers exceptional flexibility as well for the integration of future payload types, such as unmanned systems or next-generation weapons.

“The Virginia Payload Module is critical to the Navy’s undersea presence,” said Joe Senftle, vice president and general manager of Weapon Systems at BAE Systems. “With the VPM, the Navy is adding significant capability to the Virginia-class by increasing the firepower of these subs and tripling their payload capacity.”

“The Virginia Payload Module is critical to the Navy’s undersea presence,” said Joe Senftle, vice president and general manager of Weapon Systems at BAE Systems. “With the VPM, the Navy is adding significant capability to the Virginia-class by increasing the firepower of these subs and tripling their payload capacity.”

BAE Systems, which is also providing payload tubes for the SSN 803 under a previously awarded VPM contract, has a long history of supporting the Navy’s submarine fleet as the leading provider of propulsors and other submarine systems. The company was selected to provide propulsors, spare hardware, and tailcones for Block IV Virginia-class vessels and stands ready to provide the same support for the Block V subs.

Under this most recent contract, BAE Systems will also develop the processes and tooling necessary for the Block V payload tube production. Work will be performed at the company’s facility in Louisville, Kentucky, with deliveries scheduled to begin in 2020.

big bang

More like this

Quiet Buildup: India Constructing Sophisticated Multi-Layered Surveillance Shield Across Himalayas

New Delhi: India is quietly constructing a sophisticated surveillance...

DRDO to Test Indigenous Photonic Radar System Designed for Multi-Platform Deployment

New Delhi: DRDO is preparing to test its indigenous...

Kaveri 2.0 Programme Revived After 43 Years

New Delhi: India’s long‑running Kaveri engine programme has been...

India Moving Towards ‘Made in India’ Civil Aircraft Era: Civil Aviation Minister

New Delhi: Civil Aviation Minister Rammohan Naidu Kinjarapu said...

Farnborough Airshow 2026: Lockheed Martin Announces Cheaper Patriot Interceptor Missile

London: Lockheed Martin introduced a cheaper Patriot interceptor as...

Turkey is Actively Building Spaceport in Somalia, First Phase of Launch Facility Underway

Tel Aviv: Turkey is actively building a spaceport in...

Airbus Spearheads New E2D European Defence Tech Fund

Farnborough, United Kingdom. At the Farnborough International Airshow, Airbus...

GE Aerospace Partners with NASA, BETA Technologies, and Boeing on World’s First High-Altitude Hybrid Electric Flight

Bengaluru. GE Aerospace announced July 21 at the Farnborough International...
Indian Navy Special Edition 2025spot_img