ISRO Set For the First Runway Landing Experiment of Made-in-India Reusable Launch Vehicle – Technology Demonstrator

Bengaluru: In a boost to India’s space programme, The Indian Space Research Organisation is set for the first runway landing experiment (RLV-LEX) of its made-in-India Reusable Launch Vehicle – Technology Demonstrator (RLV-TD) from aeronautical test range in Karnataka’s Chitradurga district, with its Chairman S Somanath indicating that weather is being monitored.

“We are looking at the climate. Climate is still not good. So, we are waiting for the wind and other systems to become benign. We will do that,” Mr Somanath, also Secretary in the Department of Space, told a news agency.

ads

According to ISRO officials, the RLV wing body will be carried using a helicopter to an altitude of three to five km and released at a distance of about four to five km ahead of the runway with a horizontal velocity. After the release, the RLV will glide, navigate towards the runway and land autonomously with a landing gear in the defence airfield near Chitradurga.

Sources in the national space agency headquartered in Bengaluru earlier said new systems like landing gear, parachute, hook beam assembly, radar altimeter and pseudolite have been developed and qualified.

ISRO accomplished its maiden RLV-TD HEX-01 (Hypersonic Flight Experiment-01) mission on May 23, 2016 from SDSC SHAR and successfully demonstrated the critical technologies for design and flight testing of re-entry vehicles. However, it was a suborbital flight and designed to land on sea.

One of the critical technologies to be demonstrated in the RLV-LEX mission is approach and autonomous landing on a runway, according to ISRO.

big bang

In order to acquire end-to-end reusable launch vehicle (RLV) technology capability, this milestone (RLV-LEX) has to be achieved before the RLV ORE (Orbital Re-Entry Experiment) mission, ISRO officials say.

In ORE, a wing body called Orbital Re-entry Vehicle (ORV) will be taken to an orbit by an ascent vehicle derived from the existing GSLV and PSLV stages and stay in orbit for a stipulated period, re-enter and land in a runway autonomously with a landing gear.

huges

More like this

Defence & Aerospace and Embraer Propose E175 Final Assembly Line in India

New Delhi. Adani Defence & Aerospace, a leading player in...

US Navy Seeks New Anti-Radiation Missile with Long Range

Washington: The US Navy wants a new anti-radiation missile...

US Air Force’s Sentinel ICBM Programme Faces Significant Risks from Software Delays

Vandenberg Space Force Base (California): The US Air Force’s troubled...

Eurofighter Production Pipeline is Filled Until Final Assembly of FCAP Capability: BAE Systems

Paris: BAE Systems said the production pipeline for the...

DEFSAT 2026 to Focus on Space at the Core of National Security

The theme for DEFSAT 2026 is “Space at the...

From Industrial AI to Military Power: Why India’s Defence Ecosystem Needs Structural Integration

India’s AI debate has been framed largely around digital...

Fortifying National Security: India Set to Achieve Triple SSBN Milestone with Commissioning of INS Aridhaman

New Delhi: India's naval capabilities are set to receive...
Indian Navy Special Edition 2025spot_img