Test Launch Vehicle for First Human Spaceflight Rolled Out by ISRO

New Delhi: Indian Space Research Organisation (ISRO) has rolled out the Test Launch Vehicle for the first launch of Abort Demonstration of Crew Escape System (CES). “In-flight Abort Demonstration of Crew Escape System (CES)” at Mach number 1.2 with the newly developed Test Vehicle followed by Crew Module separation and safe recovery, was rolled out by ISRO. Flight demonstration and evaluation of Crew Escape System include various separation systems.

Crew Module (CM) is where the astronauts are contained in a pressurized earth like atmospheric condition during the Gaganyaan mission. The CM for the Gaganyaan mission is in different stages of development. For the Test Vehicle Abort mission-1 (TV-D1), the CM is an unpressurised version that has completed its integration and testing and is ready to be shipped to the launch complex. This unpressurised CM version has to have an overall size and mass of actual Gaganyaan CM. It houses all the systems for the deceleration and recovery. With its complete set of parachutes, recovery aids actuation systems and pyros. The avionics systems in CM are in a dual redundant mode configuration for navigation, sequencing, telemetry, instrumentation and power. The CM in this mission is extensively instrumented to capture the flight data for evaluation of the performance of various systems. The Crew Module will be recovered after touchdown in the Bay of Bengal, using a dedicated vessel and diving team from the Indian Navy.

ads

The Test Vehicle is a single-stage liquid rocket developed for this abort mission. The payloads consist of the Crew Module (CM) and Crew Escape Systems (CES) with their fast-acting solid motors, along with CM fairing (CMF) and Interface Adapters. This flight will simulate the abort condition during the ascent trajectory corresponding to a Mach number of 1.2 encountered in the Gaganyaan mission. CES with CM will be separated from the Test Vehicle at an altitude of about 17 km. Subsequently, the abort sequence will be executed autonomously commencing with the separation of CES and deployment of the series of parachutes, finally culminating in the safe touchdown of CM in the sea, about 10 km from the coast of Sriharikota.

The Crew Module after integration underwent various electrical testing, at ISRO’s facility in Bangalore, including an acoustic test and was dispatched to SDSC-SHAR on August 13. At SDSC, it underwent vibration tests and pre-integration with the Crew Escape System, before final integration to the Test Vehicle at the Launch Pad. This Test Vehicle mission with this CM is a significant milestone for the overall Gaganyaan program as a near-complete system is integrated for a flight test. The success of this test flight will set the stage for the remaining qualification tests and unmanned missions, leading to the first Gaganyaan mission with Indian Astronauts.

More like this

GRSE Sustains Growth Momentum in Q1 FY27 with Rs 1815 Crore Revenue, Rs 173 Crore PAT

Kolkata: Garden Reach Shipbuilders & Engineers Limited (GRSE), a Navratna...

Seventh Mahe-Class Ani-Submarine Warfare Shallow Water Craft ‘Machilipatnam’ Launched

Kochi: Machilipatnam (BY 529), the seventh of eight Anti-Submarine...

US Congress Approves $500 Million Allocation for Taiwan Defence

New Taipei City: US President Donald Trump is still...

Pentagon Pushes for Cheaper Long-Range Strike Weapons

Washington: With the US running low on expensive guided...

US Central Command, UAE to Establish First Bilateral Artificial Intelligence Task Force

Washington: US Central Command and the United Arab Emirates...

Rosoboronexport Presents Latest Air-to-Air Missile for Su-57E Fighter Jets   

Moscow: Rosoboronexport (part of the Rostec State Corporation) is launching...

India Rules Out New Su-30MKI Variants, Focus on Fleet Modernisation

New Delhi: India has formally ruled out new Su‑30MKI...

Apollo Micro Systems Selected by IAF Under Make-II Category for Developing Indigenous IPREK

New Delhi: Apollo Micro Systems has been shortlisted by...
Indian Navy Special Edition 2025spot_img