MoD Places Supply Order for 118 Main Battle Tanks Arjun Mk-1A for Indian Army

Date:

New Delhi: In a boost to “Make in India” and a big step towards ‘Atmanirbhar Bharat’ of Prime Minister Narendra Modi, Ministry of Defence (MoD) has placed an order with Heavy Vehicles Factory (HVF), Avadi, Chennai for supply of 118 Main Battle Tanks (MBTs) Arjun Mk-1A for the Indian Army on September 23.

The order, worth Rs 7,523 crore, will provide further boost to the ‘Make in India’ initiative in defence sector and it was on February 14 last that   the Prime Minister had handed over the MBT Arjun Mk-1A to Chief of Army Staff General M M Naravane in Chennai.

ads

The state–of-the-art MBT Mk-1A is a new variant of Arjun Tank designed to enhance fire power, mobility and survivability. Infused with 72 new features and more indigenous content from the Mk-1 variant, the tank would ensure effortless mobility in all terrains, besides precise target engagement during day and night. It has been designed and developed by Defence Research & Development Organisation (DRDO) by incorporating numerous upgrades on Arjun MBT, the in-service main battle tank with the Indian Army.

The MK-1A is equipped with accurate and superior firepower, all-terrain mobility and an invincible multi-layered protection provided by an array of advanced technology systems. It can take on the enemy during day and night conditions and in both static and dynamic modes. By virtue of these capabilities, this indigenous MBT proves to be at par with any contemporary in its class across the globe. This tank is particularly configured and designed for Indian conditions and hence it is suitable for deployment to protect the frontiers in an effective manner.

This production order to HVF, Avadi opens up a large avenue in defence manufacturing for over 200 Indian vendors including MSMEs, with employment opportunities to around 8,000 people. This will be a flagship project showcasing the indigenous capability in cutting edge defence technologies.

The MBT Arjun Mk-1A has been designed and developed by Combat Vehicles Research and Development Establishment (CVRDE), along with other laboratories of DRDO within two years (2010-12). The development activities commenced from June 2010 and the tank was fielded for user trials in June 2012. It took only two years to develop and field the MBT Arjun Mk-1A for user trials from the user requirement. Extensive trial evaluation was conducted in various phases covering 7000+ kms (both in DRDO and user trials) of automotive and substantial firing of various ammunitions during 2012-2015.

big bang

More like this

Thales is a Major Contributor to the Success of SAMP/T NG Selected by the Danish Ministry of Defence

New Delhi: Initially designed to handle the Aster family’s...

Operation Nepal 1965: Indian Army’s Counter-Offensive

After the debacle of the China War of 1962,...

Middle East: Little Room for Manoeuvrability 

In the realm of International Politics, security is regarded...

IAI Conducts First NeuSPHERE Demo Day, Showcasing Cutting-Edge Indian Startups

New Delhi. Israel Aerospace Industries (IAI), a world-class aerospace and...

New Framework to Streamline Revenue Procurement Unveiled by Ministry of Defence 

New Delhi: With Western and Northern borders continuing to...

Israel Receives First Operational Images from Ofek 19 Satellite

Tel Aviv: Two weeks after its successful launch, engineering...

Israeli Ministry of Defence Establishes New Ammunition Directorate

Tel Aviv: The shortage in certain types of ammunition...

Satellite Debris Inspection Mission: Astroscale Signs Launch Agreement with NSIL

Tokyo, Japan. Astroscale Japan Inc. (“Astroscale Japan”), a subsidiary...
Indian Navy Special EditionLatest Issue