HAL Gets Operational Clearance for Production of LUH

Date:

 

Lucknow: In a boost to the Indian defence forces, defence public sector undertaking (DPSU) Hindustan Aeronautics Limited (HAL) has received the Initial Operational Clearance (IOC) for production of the Light Utility Helicopter (LUH), which is set to replace the ageing fleet of Cheetah and Chetak helicopters.

ads

HAL CMD R Madhavan received the Initial Operational Clearance (IOC) document from G Sateesh Reddy, Secretary, Department of Defence R & D and Chairman, DRDO at the Bandhan programme held at the ongoing DefExpo 2020 in Lucknow, a company statement said on February 7.

The document was handed over in the presence of Defence Minister Rajnath Singh, Uttar Pradesh Chief Minister Yogi Adityanath and others, the HAL statement added.

Light Utility Helicopter (LUH) is a single-engine, lightweight and highly agile three-ton utility helicopter, indigenously designed and developed to meet the operational requirements of the Army and the Indian Air Force.

“It reinforces our commitment towards indigenous R&D programmes on self-reliance and enhancing operational effectiveness of the Indian armed forces. The HAL is fully geared up to fulfill the requirements of its customers in a time-bound manner,” he said.

big bang

Arup Chatterjee, Director, Engineering and R&D, HAL, said the performance of basic configuration of the LUH in all terrains and under all weather conditions was satisfactory.

“The HAL is moving towards the next phase of integrating and flight testing of mission and role equipment on the LUH,” he said.

huges

The statement said one LUH prototype is part of flying display and another is part of static display at the DefExpo 2020.

Three prototypes have been built and cumulatively completed over 550 flights under various terrains and climatic conditions like cold weather, hot weather, sea-level and high-altitude, complying to stringent certification and user requirements, it said.

The LUH’s endurance and reliability was established during the hot weather and high-altitude trials where it was ferried from Bengaluru, covering over 7,000-km distance and continuously flying for 17 days without any abnormalities, the statement added.

More like this

US Navy Unveils New Modular Surface Craft Programme

Washington: The US Navy unveiled its new Modular Attack...

Eyeing $146 Billion in Loans for Defence Procurement, EU Members Express Interest

Paris: European Union member states expressed interest in at...

Significant Advancement: Design Studies of Next-Generation ICBM Concluded by DRDO

New Delhi: The Defence Research and Development Organisation (DRDO)...

HAL Signs Manufacturing License Agreement (MLA) With GE for Co-Production of F414-INS6 Engines

New Delhi: Hindustan Aeronautics Limited (HAL) has signed a...

ISRO-NASA Developed Advanced ‘NISAR’ Satellite Successfully Launched Onboard GSLV-F16

New Delhi: The ISRO-NASA advanced NISAR satellite was successfully...

Japan Set to Receive First F-35B Fighter Early Next Month

Melbourne: The first of Japan’s Short Take Off and...

Exercise Talisman Sabre: US, Allies Firepower Demonstrations Showcased Seamless Interoperability

Rockhampton (Australia): Long-range fires featured prominently at Exercise Talisman...
Indian Navy Special EditionLatest Issue